Northshore Park

The October 2007 Civic Connection has an update on the now complete Northshore Park upgrades:

Installation of the new playground equipment at Northshore Park was completed in late September. The scope of the playground work included: removal of existing old steel slides; removal of wood framed swing sets; and removal of the wood slat park benches. These items were replaced with metal-framed swing sets and a new multi-component play module which includes slides, platforms, and climbers. Steel benches will be installed this month.

The playground replacement was completed using funding from the designated $350,000 playground replacement fund appropriated by City Council at the end of FY 2007.

The benches mentioned in the above update have been installed and look great.

Advertisement

Leave a Reply

Fill in your details below or click an icon to log in:

Gravatar
WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Connecting to %s

Follow

Get every new post delivered to your Inbox.